ITAC Assessment: ND0037
ITAC logo
ITAC Assessment: ND0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PNEUMATIC CYLINDER PARTS
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 346
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,328 4,117,526
kWh
Natural Gas $12,144 3,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,084 $17,000 $2,084
27,257
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,161 $2,253 $1,618
21,102
kWh
- $(-457.0)
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,684 $1,755 $3,244
42,497
kWh
$(-560.0)
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,425 $500 $1,425
18,757
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $476 $496 $476
6,155
kWh
- -
TOTAL RECOMMENDED $7,830 $22,004 $8,847
115,768
kWh
$(-560.0)
-
MMBtu
$(-457.0)
TOTAL IMPLEMENTED $7,830 $22,004 $8,847
115,768
kWh
$(-560.0)
-
MMBtu
$(-457.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs