ITAC Assessment: MA0201
ITAC logo
ITAC Assessment: MA0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FRESH & CANNED MUSHROOMS
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 27,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $997,000 15,847,011
kWh
Fuel Oil #4 $36,992 8,127
MMBtu
Fuel Oil #6 $464,251 146,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Fuel Oil #6 Savings
01 2.2511: Insulate bare equipment $2,084 $1,762 - $2,084
-
MMBtu
-
02 2.2511: Insulate bare equipment $2,084 $1,762 - $2,084
-
MMBtu
-
03 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $159,131 $425,925 $(-15,758.0)
(-250,586)
kWh
- $174,889
-
MMBtu
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,784 $500 $1,401
22,274
kWh
$1,383
-
MMBtu
-
TOTAL RECOMMENDED $166,083 $429,949 $(-14,357.0)
(-228,312)
kWh
$5,551
-
MMBtu
$174,889
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs