ITAC Assessment: MA0203
ITAC logo
ITAC Assessment: MA0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 380
thousand feet
Production Hrs. Annual 4,718
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,775 2,900,645
kWh
Natural Gas $107,034 25,597
MMBtu
Fuel Oil #4 $49,487 11,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.7245: Use direct air supply to exhaust hoods $13,019 $8,029 - $8,516
-
MMBtu
$4,503
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $7,245 $2,182 - $4,956
-
MMBtu
$2,289
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $778 $547 - $532
-
MMBtu
$246
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,651 $32,018 $12,651
130,129
kWh
- -
05 2.6232: Install set-back timers $642 $161 $642
6,741
kWh
- -
TOTAL RECOMMENDED $34,335 $42,937 $13,293
136,870
kWh
$14,004
-
MMBtu
$7,038
-
MMBtu
TOTAL IMPLEMENTED $34,335 $42,937 $13,293
136,870
kWh
$14,004
-
MMBtu
$7,038
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs