ITAC Assessment: CO0112
ITAC logo
ITAC Assessment: CO0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product WHITE GRANULATED SUGAR
NAICS
n/a
SIC 2063: Beet Sugar
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 350,000
ton
Production Hrs. Annual 3,650
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,694 7,765,827
kWh
Fuel Oil #2 $55,205 30,133
MMBtu
Coal $924,268 815,740
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $378,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.4221: Install compressor air intakes in coolest locations $198 $100 $198
4,689
kWh
-
02 2.2136: Install / repair insulation on steam lines $5,919 $9,000 - $5,919
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $776 - $776
18,464
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $89,563 $4,000 - $89,563
-
MMBtu
05 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $281,382 $1,200,000 $315,282
7,470,106
kWh
$(-33,900.0)
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $223 $399 $223
5,275
kWh
-
TOTAL RECOMMENDED $378,061 $1,213,499 $316,479
7,498,534
kWh
$61,582
-
MMBtu
TOTAL IMPLEMENTED $96,679 $13,499 $1,197
28,428
kWh
$95,482
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs