ITAC Assessment: OK1031
ITAC logo
ITAC Assessment: OK1031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 200,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,774 1,751,120
kWh
Natural Gas $27,203 3,790
MMBtu
Waste Disposal Costs
Water Usage $20,100 5,500
Tgal
TOTAL YEARLY COSTS $263,077
RECOMMENDED SAVINGS* $68,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $37,935 $21,052 $37,935
307,912
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,015 $8,099 $13,015
105,641
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,053 $4,865 $2,053
16,661
kWh
04 2.4221: Install compressor air intakes in coolest locations $6,011 $1,186 $6,011
48,793
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,590 $745 $5,590
45,377
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,734 - $3,734
30,310
kWh
TOTAL RECOMMENDED $68,338 $35,947 $68,338
554,694
kWh
TOTAL IMPLEMENTED $53,270 $22,983 $53,270
432,392
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs