Assessment Year | 1999 |
---|---|
Principal Product | Corrugated cardboard sheets |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
53,911
ft2
|
Annual Production | 288,000
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,706 | 2,185,229 |
kWh
|
$0.046 |
Natural Gas | $188,598 | 50,407 |
MMBtu
|
$3.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $159,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,883 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $701 | $658 |
$701
15,240
kWh
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,457 | $300 |
$1,457
31,653
kWh
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $360 | $135 |
$360
7,913
kWh
|
- | - | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $19,644 | $12,500 | - |
$19,644
-
MMBtu
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $4,085 | $761 | - |
$4,085
-
MMBtu
|
- | - | - | |
06 | 2.2135: Repair and eliminate steam leaks | $10,816 | $730 | - |
$10,816
-
MMBtu
|
- | - | - | |
07 | 2.2113: Repair or replace steam traps | $5,382 | $1,690 | - |
$5,382
-
MMBtu
|
- | - | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $4,552 | $980 | - |
$4,552
-
MMBtu
|
- | - | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $17,682 | $15,000 | - | - |
$17,682
-
gal
|
- | - | |
10 | 3.5316: Contract a wood pallet recycling company | $1,200 | $42 | - | - | - |
$1,200
-
lb
|
- | |
11 | 4.111: Add equipment/ operators to reduce production bottleneck | $54,912 | - | - | - | - | - | $54,912 | |
12 | 4.111: Add equipment/ operators to reduce production bottleneck | $3,955 | $1,000 | - | - | - | - | $3,955 | |
13 | 4.812: Apply for investment incentives | $34,699 | - | - | - | - | - | $34,699 | |
TOTAL RECOMMENDED | $159,445 | $33,796 |
$2,518
54,806
kWh
|
$44,479
-
MMBtu
|
$17,682
-
gal
|
$1,200
-
lb
|
$93,566 | ||
TOTAL IMPLEMENTED | $56,883 | $3,881 |
$701
15,240
kWh
|
$20,283
-
MMBtu
|
- |
$1,200
-
lb
|
$34,699 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs