ITAC Assessment: WV0171
ITAC logo
ITAC Assessment: WV0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Corrugated cardboard sheets
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 53,911
ft2
Annual Production 288,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,706 2,185,229
kWh
Natural Gas $188,598 50,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $701 $658 $701
15,240
kWh
- - - -
02 2.4221: Install compressor air intakes in coolest locations $1,457 $300 $1,457
31,653
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 $135 $360
7,913
kWh
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $19,644 $12,500 - $19,644
-
MMBtu
- - -
05 2.2511: Insulate bare equipment $4,085 $761 - $4,085
-
MMBtu
- - -
06 2.2135: Repair and eliminate steam leaks $10,816 $730 - $10,816
-
MMBtu
- - -
07 2.2113: Repair or replace steam traps $5,382 $1,690 - $5,382
-
MMBtu
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $4,552 $980 - $4,552
-
MMBtu
- - -
09 3.4111: Use closed cycle process to minimize waste water production $17,682 $15,000 - - $17,682
-
gal
- -
10 3.5316: Contract a wood pallet recycling company $1,200 $42 - - - $1,200
-
lb
-
11 4.111: Add equipment/ operators to reduce production bottleneck $54,912 - - - - - $54,912
12 4.111: Add equipment/ operators to reduce production bottleneck $3,955 $1,000 - - - - $3,955
13 4.812: Apply for investment incentives $34,699 - - - - - $34,699
TOTAL RECOMMENDED $159,445 $33,796 $2,518
54,806
kWh
$44,479
-
MMBtu
$17,682
-
gal
$1,200
-
lb
$93,566
TOTAL IMPLEMENTED $56,883 $3,881 $701
15,240
kWh
$20,283
-
MMBtu
- $1,200
-
lb
$34,699
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs