ITAC Assessment: MA0200
ITAC logo
ITAC Assessment: MA0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ASPHALT ROOFING SHINGLES
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area
n/a
Annual Production 120,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,054 4,881,008
kWh
LPG $31,773 6,137
MMBtu
Fuel Oil #2 $33,219 6,860
MMBtu
Fuel Oil #6 $371,085 128,744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $45,965 $47,912 - $45,965
-
MMBtu
-
02 2.2113: Repair or replace steam traps $4,450 $2,880 - $7,330
-
MMBtu
$(-2,880.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,023 $15,974 $3,023
41,911
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $106 $73 $106
1,465
kWh
- -
05 2.4133: Use most efficient type of electric motors $486 $451 $486
6,741
kWh
- -
TOTAL RECOMMENDED $54,030 $67,290 $3,615
50,117
kWh
$53,295
-
MMBtu
$(-2,880.0)
TOTAL IMPLEMENTED $53,544 $66,839 $3,129
43,376
kWh
$53,295
-
MMBtu
$(-2,880.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs