ITAC Assessment: MI0441
ITAC logo
ITAC Assessment: MI0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Peptones and Amino Acids
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 77,897
ft2
Annual Production 500,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,500 2,676,960
kWh
Electricity Demand $98,908 6,576
kW-mo/yr
Electricity Fees $54,311 -
Natural Gas $130,778 45,182
MMBtu
Waste Disposal Costs
Water Usage $139,890 11,779
Tgal
Water Disposal $175,219 11,779
Tgal
TOTAL YEARLY COSTS $765,606
RECOMMENDED SAVINGS* $110,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $58,244 $186,000 $38,957
628,337
kWh
$19,287
-
kW-mo/yr
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $24,362 $840 $16,615
267,977
kWh
$8,227
-
kW-mo/yr
- - $(-480.0)
03 3.4116: Meter recycled water (to reduce sewer charges) $21,427 $1,306 - - - $21,427
-
Tgal
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,377 $510 $1,760
28,380
kWh
$617
-
kW-mo/yr
- - -
05 2.9112: Use solar heat to heat water $2,247 $2,602 - - $3,847
-
MMBtu
- $(-1,600.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,124 $1,980 $831
13,407
kWh
$293
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $671 $1,203 $671
10,821
kWh
- - - -
TOTAL RECOMMENDED $110,453 $194,441 $58,834
948,922
kWh
$28,424
-
kW-mo/yr
$3,847
-
MMBtu
$21,427
-
Tgal
$(-2,080.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs