| Assessment Year | 2024 |
|---|---|
| Principal Product | Peptones and Amino Acids |
| NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
77,897
ft2
|
| Annual Production | 500,000
lb
|
| Production Hrs. Annual | 5,880
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $166,500 | 2,676,960 |
kWh
|
$0.062 | |
| Electricity Demand | $98,908 | 6,576 |
kW-mo/yr
|
$15.04 | |
| Electricity Fees | $54,311 | - |
|
- | |
| Natural Gas | $130,778 | 45,182 |
MMBtu
|
$2.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $139,890 | 11,779 |
Tgal
|
$11.88 | |
| Water Disposal | $175,219 | 11,779 |
Tgal
|
$14.88 | |
| TOTAL YEARLY COSTS | $765,606 | ||||
| RECOMMENDED SAVINGS* | $110,453 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $83,844 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $58,244 | $186,000 |
$38,957
628,337
kWh
|
$19,287
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $24,362 | $840 |
$16,615
267,977
kWh
|
$8,227
-
kW-mo/yr
|
- | - | $(-480.0) | |
| 03 | 3.4116: Meter recycled water (to reduce sewer charges) | $21,427 | $1,306 | - | - | - |
$21,427
-
Tgal
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,377 | $510 |
$1,760
28,380
kWh
|
$617
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.9112: Use solar heat to heat water | $2,247 | $2,602 | - | - |
$3,847
-
MMBtu
|
- | $(-1,600.0) | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,124 | $1,980 |
$831
13,407
kWh
|
$293
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7135: Install occupancy sensors | $671 | $1,203 |
$671
10,821
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $110,453 | $194,441 |
$58,834
948,922
kWh
|
$28,424
-
kW-mo/yr
|
$3,847
-
MMBtu
|
$21,427
-
Tgal
|
$(-2,080.0) | ||
| TOTAL IMPLEMENTED | $83,844 | $190,999 |
$42,219
680,945
kWh
|
$20,197
-
kW-mo/yr
|
- |
$21,427
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs