Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 60,750
ft2
Annual Production 85,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,648 2,131,800
kWh
Electricity Demand $214,236 10,573
kW-mo/yr
Electricity Fees $4,635 -
Natural Gas $81,082 21,982
MMBtu
Waste Disposal Costs
Water Usage $5,364 1,496
Tgal
TOTAL YEARLY COSTS $360,965
RECOMMENDED SAVINGS* $14,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,355 - $(-4,469.4)
(0)
kWh
$18,228
-
kW-mo/yr
$(-396.0) $(-1,008.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,774 $15,206 $790
29,925
kWh
$984
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $335 $1,000 $461
17,746
kWh
- - $(-126.0)
TOTAL RECOMMENDED $14,464 $16,206 $(-3,218.2)
47,671
kWh
$19,212
-
kW-mo/yr
$(-396.0) $(-1,134.0)
TOTAL IMPLEMENTED $14,464 $16,206 $(-3,218.2)
47,671
kWh
$19,212
-
kW-mo/yr
$(-396.0) $(-1,134.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs