ITAC Assessment: SF0174
ITAC logo
ITAC Assessment: SF0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rigid Foam Insulation
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 875,560
ft2
Annual Production 34,000
thousand feet
Production Hrs. Annual 2,253
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,160 1,355,510
kWh
Electricity Demand $57,041 5,358
kW-mo/yr
Natural Gas $33,255 6,025
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,862 $3,899 $6,654
126,612
kWh
$7,189
-
kW-mo/yr
$(-2,981.0)
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $600 $364 $288
5,569
kWh
$312
-
kW-mo/yr
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $39,185 $52,900 $24,011
457,503
kWh
$25,943
-
kW-mo/yr
$(-10,769.0)
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $588 $1,949 $283
5,275
kWh
$305
-
kW-mo/yr
- - -
05 3.5248: Separate and recycle scrap metal to foundry or for sale $604 - - - - $604
-
lb
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $29,453 $34,995 - - - $29,453
-
lb
-
07 2.3132: Recharge batteries on during off-peak demand periods $1,673 - - - - - $1,673
08 4.445: Install equipment to move product $9,463 $4,000 - - - - $9,463
09 2.3212: Optimize plant power factor $1,062 $1,729 - - - - $1,062
TOTAL RECOMMENDED $93,490 $99,836 $31,236
594,959
kWh
$33,749
-
kW-mo/yr
$(-13,750.0)
-
MMBtu
$30,057
-
lb
$12,198
TOTAL IMPLEMENTED $3,465 $2,313 $571
10,844
kWh
$617
-
kW-mo/yr
- $604
-
lb
$1,673
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs