| Assessment Year | 1999 |
|---|---|
| Principal Product | Rigid Foam Insulation |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 38 |
| Plant Area |
875,560
ft2
|
| Annual Production | 34,000
thousand feet
|
| Production Hrs. Annual | 2,253
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $71,160 | 1,355,510 |
kWh
|
$0.052 |
| Electricity Demand | $57,041 | 5,358 |
kW-mo/yr
|
$10.65 |
| Natural Gas | $33,255 | 6,025 |
MMBtu
|
$5.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $93,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,465 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,862 | $3,899 |
$6,654
126,612
kWh
|
$7,189
-
kW-mo/yr
|
$(-2,981.0)
-
MMBtu
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $600 | $364 |
$288
5,569
kWh
|
$312
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $39,185 | $52,900 |
$24,011
457,503
kWh
|
$25,943
-
kW-mo/yr
|
$(-10,769.0)
-
MMBtu
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $588 | $1,949 |
$283
5,275
kWh
|
$305
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $604 | - | - | - | - |
$604
-
lb
|
- | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $29,453 | $34,995 | - | - | - |
$29,453
-
lb
|
- | |
| 07 | 2.3132: Recharge batteries on during off-peak demand periods | $1,673 | - | - | - | - | - | $1,673 | |
| 08 | 4.445: Install equipment to move product | $9,463 | $4,000 | - | - | - | - | $9,463 | |
| 09 | 2.3212: Optimize plant power factor | $1,062 | $1,729 | - | - | - | - | $1,062 | |
| TOTAL RECOMMENDED | $93,490 | $99,836 |
$31,236
594,959
kWh
|
$33,749
-
kW-mo/yr
|
$(-13,750.0)
-
MMBtu
|
$30,057
-
lb
|
$12,198 | ||
| TOTAL IMPLEMENTED | $3,465 | $2,313 |
$571
10,844
kWh
|
$617
-
kW-mo/yr
|
- |
$604
-
lb
|
$1,673 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs