Assessment Year | 2009 |
---|---|
Principal Product | Automotive Interior Trim |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
134,000
ft2
|
Annual Production | 2,200,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $326,035 | 6,625,113 |
kWh
|
$0.049 |
Electricity Demand | $190,126 | 16,529 |
kW-mo/yr
|
$11.50 |
Natural Gas | $614,879 | 58,801 |
MMBtu
|
$10.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $220,024 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $140,582 | $6,000 | - | - |
$140,582
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $36,798 | $13,000 | - | - |
$36,798
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,424 | $9,135 |
$9,031
183,514
kWh
|
$4,393
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $12,510 | $3,000 | - | - |
$12,510
-
MMBtu
|
|
05 | 2.7313: Recycle air for heating, ventilation and air conditioning | $8,360 | $3,300 | - | - |
$8,360
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $5,195 | $1,000 |
$3,493
70,989
kWh
|
$1,702
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $3,155 | $4,232 |
$3,155
64,109
kWh
|
- | - | |
TOTAL RECOMMENDED | $220,024 | $39,667 |
$15,679
318,612
kWh
|
$6,095
-
kW-mo/yr
|
$198,250
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs