Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0212 #01 Y:1991 Install compressor air intakes in coolest locations $1,099 $2,649
MA0210 #06 Y:1991 Convert combustion equipment to burn oil $1,286 $2,375
MA0210 #05 Y:1991 Direct warmest air to combustion intake $151 $405
MA0210 #04 Y:1991 Utilize higher efficiency lamps and/or ballasts $136 $47
MA0210 #03 Y:1991 Preheat boiler makeup water with waste process heat $651 $2,764
MA0210 #02 Y:1991 Analyze flue gas for proper air/fuel ratio $191 $350
MA0210 #01 Y:1991 Install / repair insulation on condensate lines $300 $136
MA0209 #06 Y:1991 Recover waste heat from equipment $693 $598
MA0209 #05 Y:1991 Install set-back timers $175 $161
MA0209 #04 Y:1991 Reduce the pressure of compressed air to the minimum required $146 $200
MA0209 #03 Y:1991 Lower temperature during the winter season and vice-versa $1,363 -
MA0209 #02 Y:1991 Turn off equipment during breaks, reduce operating time $6,297 -
MA0209 #01 Y:1991 Utilize higher efficiency lamps and/or ballasts $399 -
MA0208 #05 Y:1991 Install set-back timers $837 $818
MA0208 #04 Y:1991 Utilize higher efficiency lamps and/or ballasts $655 -
MA0208 #03 Y:1991 Reschedule plant operations or reduce load to avoid peaks $787 $965
MA0208 #02 Y:1991 Insulate bare equipment $4,350 $500
MA0208 #01 Y:1991 Re-size charging openings or add movable cover or door $5,634 $400
MA0207 #06 Y:1991 Install compressor air intakes in coolest locations $292 $381
MA0207 #05 Y:1991 Optimize plant power factor $2,718 $4,000