ITAC Assessment: MA0210
ITAC logo
ITAC Assessment: MA0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COTTEN,POLY BLEND SHIRTS
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $5
M
to 10
M
# of Employees 180
Plant Area
n/a
Annual Production 2,880,000
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,162 282,532
kWh
Natural Gas $7,665 1,202
MMBtu
Fuel Oil #4 $8,792 1,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.2122: Install / repair insulation on condensate lines $300 $136 - $140
-
MMBtu
$160
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $191 $350 - $191
-
MMBtu
-
03 2.2441: Preheat boiler makeup water with waste process heat $651 $2,764 - $651
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $136 $47 $136
1,465
kWh
- -
05 2.1213: Direct warmest air to combustion intake $151 $405 - $77
-
MMBtu
$74
-
MMBtu
06 2.1333: Convert combustion equipment to burn oil $1,286 $2,375 - - $1,286
-
MMBtu
TOTAL RECOMMENDED $2,715 $6,077 $136
1,465
kWh
$1,059
-
MMBtu
$1,520
-
MMBtu
TOTAL IMPLEMENTED $2,715 $6,077 $136
1,465
kWh
$1,059
-
MMBtu
$1,520
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs