Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Hardcover and Softcover Books
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 367
Plant Area 190,000
ft2
Annual Production 19,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,649 8,013,538
kWh
Electricity Demand $165,233 17,302
kW-mo/yr
Natural Gas $90,255 9,538
MMBtu
Fuel Oil #2 $102,634 9,193
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Increase in Production Savings
01 2.4226: Use / purchase optimum sized compressor $29,905 $50,000 $20,066
456,005
kWh
$4,185
-
kW-mo/yr
- $5,654
02 2.7261: Install timers and/or thermostats $29,184 $20,000 $12,369
281,085
kWh
$5,577
-
kW-mo/yr
$11,238
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,625 $20,000 $7,495
170,367
kWh
$3,130
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $5,950 $800 $5,950
135,233
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,181 $300 $2,950
67,033
kWh
$1,231
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,288 $1,500 $1,612
36,688
kWh
$676
-
kW-mo/yr
- -
07 2.6218: Turn off equipment when not in use $1,147 $750 $1,147
26,068
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $12,083 $14,479 $8,523
193,752
kWh
$3,560
-
kW-mo/yr
- -
TOTAL RECOMMENDED $95,363 $107,829 $60,112
1,366,231
kWh
$18,359
-
kW-mo/yr
$11,238
-
MMBtu
$5,654
TOTAL IMPLEMENTED $25,649 $17,829 $20,182
458,774
kWh
$5,467
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Increase in Production Savings