ITAC Assessment: MA0208
ITAC logo
ITAC Assessment: MA0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ALUMINUM SAND CASTINGS
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 29
Plant Area
n/a
Annual Production 500,000
lb
Production Hrs. Annual 2,621
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,819 551,876
kWh
LPG $7,749 61,097
MMBtu
Fuel Oil #2 $49,912 9,335
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2531: Re-size charging openings or add movable cover or door $5,634 $400 - $5,634
-
MMBtu
-
02 2.2511: Insulate bare equipment $4,350 $500 - $4,350
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $787 $965 $787
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $655 - $722
7,913
kWh
- $(-67.0)
05 2.6232: Install set-back timers $837 $818 $837
9,086
kWh
- -
TOTAL RECOMMENDED $12,263 $2,683 $2,346
16,999
kWh
$9,984
-
MMBtu
$(-67.0)
TOTAL IMPLEMENTED $12,263 $2,683 $2,346
16,999
kWh
$9,984
-
MMBtu
$(-67.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs