Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Egg Cartons and Egg Trays
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 240
Plant Area 343,500
ft2
Annual Production 6,772,500,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $618,930 32,235,932
kWh
Electricity Demand $615,576 50,402
kW-mo/yr
Electricity Fees $125,319 -
Natural Gas $1,435,087 488,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2692: Use outside cold water source as a supply of cooling water $16,970 $35,000 $8,387
436,694
kWh
$7,623
-
kW-mo/yr
$960 - - - -
02 2.4133: Use most efficient type of electric motors $5,567 $56,336 $2,752
143,318
kWh
$2,500
-
kW-mo/yr
$315 - - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,350 $324 $670
34,584
kWh
$586
-
kW-mo/yr
$94 - - - -
04 2.4239: Eliminate or reduce compressed air usage $13,915 $29,000 $6,532
340,270
kWh
$6,595
-
kW-mo/yr
$788 - - - -
05 3.4151: Minimize water usage $8,289 $2,400 $709
36,928
kWh
$645
-
kW-mo/yr
$81 - $6,854
-
Tgal
- -
06 3.4111: Use closed cycle process to minimize waste water production $34,271 $19,000 - - - - $27,476
-
Tgal
- $6,795
07 3.4151: Minimize water usage $26,306 $7,850 $903
47,186
kWh
$820
-
kW-mo/yr
$104 - $24,479
-
Tgal
- -
08 4.423: Move product using mechanical means $39,645 $60,000 - - - - - $36,000 $3,645
09 2.2211: Use optimum temperature $94,400 - - - - $94,400
-
MMBtu
- - -
TOTAL RECOMMENDED $240,713 $209,910 $19,953
1,038,980
kWh
$18,769
-
kW-mo/yr
$2,342 $94,400
-
MMBtu
$58,809
-
Tgal
$36,000 $10,440
TOTAL IMPLEMENTED $40,162 $66,586 $4,364
227,432
kWh
$3,965
-
kW-mo/yr
$500 - $31,333
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs