ITAC Assessment: OK0301
ITAC logo
ITAC Assessment: OK0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CANDY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 27,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,986 4,643,904
kWh
Natural Gas $81,172 54,654
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,177 $650 $3,177
73,564
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,279 $823 $1,445
33,411
kWh
- $(-166.0)
03 2.3212: Optimize plant power factor $3,131 $6,000 $3,131
-
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,277 $1,500 - $3,277
-
MMBtu
-
05 2.6242: Minimize operation of equipment maintained in standby condition $4,774 $1,000 - $4,774
-
MMBtu
-
TOTAL RECOMMENDED $15,638 $9,973 $7,753
106,975
kWh
$8,051
-
MMBtu
$(-166.0)
TOTAL IMPLEMENTED $4,556 $2,323 $1,445
33,411
kWh
$3,277
-
MMBtu
$(-166.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs