ITAC Assessment: UD0192
ITAC logo
ITAC Assessment: UD0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product INJEC-MOLDED AUTO PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,907 1,966,002
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,234 $2,500 $1,884
29,894
kWh
$(-650.0)
-
MMBtu
02 2.7314: Reduce ventilation air $4,173 $2,500 $4,476
102,286
kWh
$(-303.0)
-
MMBtu
TOTAL RECOMMENDED $5,407 $5,000 $6,360
132,180
kWh
$(-953.0)
-
MMBtu
TOTAL IMPLEMENTED $5,407 $5,000 $6,360
132,180
kWh
$(-953.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs