ITAC Assessment: UD0474
ITAC logo
ITAC Assessment: UD0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product plastic drums
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 165,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $538,136 9,612,837
kWh
Natural Gas $15,654 3,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $17,216 $20,000 $17,216
-
kWh
-
02 2.4226: Use / purchase optimum sized compressor $12,332 $14,000 $10,732
182,591
kWh
$1,600
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,945 - $8,945
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,696 $2,857 $1,696
36,635
kWh
-
05 2.7122: Disconnect ballasts $4,012 $300 $3,484
126,026
kWh
$528
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,825 $2,000 $8,825
188,159
kWh
-
TOTAL RECOMMENDED $53,026 $39,157 $50,898
533,411
kWh
$2,128
TOTAL IMPLEMENTED $21,228 $20,300 $20,700
126,026
kWh
$528
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs