ITAC Assessment: UF0526
ITAC logo
ITAC Assessment: UF0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bread Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 250,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 4,862
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $793,917 12,362,955
kWh
Electricity Demand $196,416 23,673
kW-mo/yr
Electricity Fees $3,628 -
Natural Gas $853,109 242,225
MMBtu
Waste Disposal Costs
Water Usage $40,014 22,678
Tgal
Water Disposal $85,803 18,832
Tgal
TOTAL YEARLY COSTS $1,972,887
RECOMMENDED SAVINGS* $914,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $914,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $727,193 $3,000,000 $1,035,200
16,000,000
kWh
$199,200
-
kW-mo/yr
$(-329,607.0)
-
MMBtu
- $(-177,600.0) -
02 2.2437: Recover waste heat from equipment $95,677 $50,000 - - $95,677
-
MMBtu
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $75,075 $4,000 - - $75,075
-
MMBtu
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,403 - $3,210
49,611
kWh
- - $936 - $1,257
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,088 $496 $5,088
78,642
kWh
- - - - -
06 2.4222: Install adequate dryers on air lines to eliminate blowdown $3,132 $9,341 $3,132
48,407
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,738 $13,541 $2,329
36,004
kWh
$409
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $914,306 $3,077,378 $1,048,959
16,212,664
kWh
$199,609
-
kW-mo/yr
$(-158,855.0)
-
MMBtu
$936 $(-177,600.0) $1,257
TOTAL IMPLEMENTED $914,306 $3,077,378 $1,048,959
16,212,664
kWh
$199,609
-
kW-mo/yr
$(-158,855.0)
-
MMBtu
$936 $(-177,600.0) $1,257
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs