Assessment Year | 2019 |
---|---|
Principal Product | Bread Products |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
250,000
ft2
|
Annual Production | 80,000,000
lb
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $793,917 | 12,362,955 |
kWh
|
$0.064 | |
Electricity Demand | $196,416 | 23,673 |
kW-mo/yr
|
$8.30 | |
Electricity Fees | $3,628 | - |
|
- | |
Natural Gas | $853,109 | 242,225 |
MMBtu
|
$3.52 | |
Waste Disposal Costs | |||||
Water Usage | $40,014 | 22,678 |
Tgal
|
$1.76 | |
Water Disposal | $85,803 | 18,832 |
Tgal
|
$4.56 | |
TOTAL YEARLY COSTS | $1,972,887 | ||||
RECOMMENDED SAVINGS* | $914,306 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $914,306 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $727,193 | $3,000,000 |
$1,035,200
16,000,000
kWh
|
$199,200
-
kW-mo/yr
|
$(-329,607.0)
-
MMBtu
|
- | $(-177,600.0) | - | |
02 | 2.2437: Recover waste heat from equipment | $95,677 | $50,000 | - | - |
$95,677
-
MMBtu
|
- | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $75,075 | $4,000 | - | - |
$75,075
-
MMBtu
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,403 | - |
$3,210
49,611
kWh
|
- | - | $936 | - | $1,257 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,088 | $496 |
$5,088
78,642
kWh
|
- | - | - | - | - | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $3,132 | $9,341 |
$3,132
48,407
kWh
|
- | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,738 | $13,541 |
$2,329
36,004
kWh
|
$409
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $914,306 | $3,077,378 |
$1,048,959
16,212,664
kWh
|
$199,609
-
kW-mo/yr
|
$(-158,855.0)
-
MMBtu
|
$936 | $(-177,600.0) | $1,257 | ||
TOTAL IMPLEMENTED | $914,306 | $3,077,378 |
$1,048,959
16,212,664
kWh
|
$199,609
-
kW-mo/yr
|
$(-158,855.0)
-
MMBtu
|
$936 | $(-177,600.0) | $1,257 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs