ITAC Assessment: AM0319
ITAC logo
ITAC Assessment: AM0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Fiberglass fabrics
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 212,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,496
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,480 4,907,972
kWh
Electricity Demand $38,760 9,120
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,640 $450 $8,640
137,749
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $6,645 $900 $6,390
101,993
kWh
$255
-
kW-mo/yr
-
03 2.7131: Add area lighting switches $5,110 $1,700 $5,110
81,770
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,400 $30 $3,100
49,531
kWh
$300
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $2,960 $490 $2,700
43,083
kWh
$260
-
kW-mo/yr
-
06 4.652: Replace existing equipment with more suitable substitutes $445 $405 $110
1,758
kWh
$10
-
kW-mo/yr
$325
TOTAL RECOMMENDED $27,200 $3,975 $26,050
415,884
kWh
$825
-
kW-mo/yr
$325
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs