ITAC Assessment: BS0116
ITAC logo
ITAC Assessment: BS0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 240,000
ft2
Annual Production 416,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,995 1,424,875
kWh
Electricity Demand $20,969 3,119
kW-mo/yr
Electricity Fees $3,856 -
Natural Gas $8,498 1,294
MMBtu
TOTAL YEARLY COSTS $107,317
RECOMMENDED SAVINGS* $18,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $113 $50 $104
2,000
kWh
$9
-
kW-mo/yr
-
02 2.7243: Improve air circulation with destratification fans / other methods $1,415 $1,176 $22
425
kWh
- $1,393
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,158 $13,685 $5,558
107,033
kWh
$5,363
-
kW-mo/yr
$(-2,763.0)
-
MMBtu
04 2.3322: Use existing dam to generate electricity $437 $6,000 $437
8,410
kWh
- -
05 2.9114: Use solar heat to make electricty $8,150 $166,500 $8,150
156,942
kWh
- -
TOTAL RECOMMENDED $18,273 $187,411 $14,271
274,810
kWh
$5,372
-
kW-mo/yr
$(-1,370.0)
-
MMBtu
TOTAL IMPLEMENTED $113 $50 $104
2,000
kWh
$9
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs