| Assessment Year | 2018 |
|---|---|
| Principal Product | Waste Water Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 6 |
| Plant Area |
240,000
ft2
|
| Annual Production | 416,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $73,995 | 1,424,875 |
kWh
|
$0.052 |
| Electricity Demand | $20,969 | 3,119 |
kW-mo/yr
|
$6.72 |
| Electricity Fees | $3,856 | - |
|
- |
| Natural Gas | $8,498 | 1,294 |
MMBtu
|
$6.56 |
| TOTAL YEARLY COSTS | $107,317 | |||
| RECOMMENDED SAVINGS* | $18,273 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $113 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $113 | $50 |
$104
2,000
kWh
|
$9
-
kW-mo/yr
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $1,415 | $1,176 |
$22
425
kWh
|
- |
$1,393
-
MMBtu
|
|
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,158 | $13,685 |
$5,558
107,033
kWh
|
$5,363
-
kW-mo/yr
|
$(-2,763.0)
-
MMBtu
|
|
| 04 | 2.3322: Use existing dam to generate electricity | $437 | $6,000 |
$437
8,410
kWh
|
- | - | |
| 05 | 2.9114: Use solar heat to make electricty | $8,150 | $166,500 |
$8,150
156,942
kWh
|
- | - | |
| TOTAL RECOMMENDED | $18,273 | $187,411 |
$14,271
274,810
kWh
|
$5,372
-
kW-mo/yr
|
$(-1,370.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $113 | $50 |
$104
2,000
kWh
|
$9
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs