Assessment Year | 2023 |
---|---|
Principal Product | Capacitive and piezoelectric quart |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $100 M to 500M |
# of Employees | 419 |
Plant Area |
143,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,314 | 2,594,629 |
kWh
|
$0.053 |
Electricity Demand | $126,364 | 34,060 |
kW-mo/yr
|
$3.71 |
Electricity Fees | $70,852 | - |
|
- |
Natural Gas | $32,197 | 3,248 |
MMBtu
|
$9.91 |
TOTAL YEARLY COSTS | $365,726 | |||
RECOMMENDED SAVINGS* | $22,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $6,088 | - |
$6,088
114,869
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $5,596 | $390 | - | - |
$5,596
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $651 | $85 | - | - |
$651
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,404 | $1,750 |
$4,404
83,103
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,343 | $4,218 |
$1,965
39,296
kWh
|
$612
-
kW-mo/yr
|
- | $1,767 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $258 | $250 |
$139
2,628
kWh
|
$13
-
kW-mo/yr
|
- | $106 | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $1,035 | $1,460 |
$1,035
19,536
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $22,377 | $8,153 |
$13,632
259,433
kWh
|
$625
-
kW-mo/yr
|
$6,248
-
MMBtu
|
$1,873 | ||
TOTAL IMPLEMENTED | $9,657 | $6,303 |
$6,508
125,028
kWh
|
$625
-
kW-mo/yr
|
$651
-
MMBtu
|
$1,873 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs