| Assessment Year | 2005 |
|---|---|
| Principal Product | Vinegar, apple juice and mustard |
| NAICS | 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
68,000
ft2
|
| Annual Production | 6,600
Tgal
|
| Production Hrs. Annual | 2,288
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $248,418 | 2,829,207 |
kWh
|
$0.088 |
| Electricity Demand | $43,888 | 14,961 |
kW-mo/yr
|
$2.93 |
| Natural Gas | $37,456 | 3,001 |
MMBtu
|
$12.48 |
| LPG | $117,237 | 12,994 |
MMBtu
|
$9.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $118,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $116,383 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $68,834 | $23,508 | - | - |
$68,834
-
MMBtu
|
- | |
| 02 | 4.111: Add equipment/ operators to reduce production bottleneck | $26,800 | $41,620 | - | - |
$(-18,400.0)
-
MMBtu
|
$45,200 | |
| 03 | 2.2135: Repair and eliminate steam leaks | $18,805 | $517 | - | - |
$18,805
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $1,944 | $7,285 | - | - |
$1,944
-
MMBtu
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,023 | - |
$660
7,100
kWh
|
$363
-
kW-mo/yr
|
- | - | |
| 06 | 2.3212: Optimize plant power factor | $512 | $195 |
$512
5,500
kWh
|
- | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $233 | $30 |
$233
2,300
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $118,151 | $73,155 |
$1,405
14,900
kWh
|
$363
-
kW-mo/yr
|
$71,183
-
MMBtu
|
$45,200 | ||
| TOTAL IMPLEMENTED | $116,383 | $72,930 | - | - |
$71,183
-
MMBtu
|
$45,200 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs