ITAC Assessment: UM0124
ITAC logo
ITAC Assessment: UM0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Hydraulic and Cutting Fluids
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 61
Plant Area 92,400
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,243 2,673,798
kWh
Electricity Demand $97,676 5,220
kW-mo/yr
Electricity Fees $(-2,453.0) -
Natural Gas $302,175 83,005
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $186,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $1,424 $1,183 $736
26,964
kWh
$688
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,856 $10,304 $1,510
55,100
kWh
$3,346
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $426 $1,000 $426
15,826
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,583 $3,500 $5,583
210,141
kWh
- - - -
05 2.2441: Preheat boiler makeup water with waste process heat $17,113 $4,120 - - $17,113
-
MMBtu
- -
06 3.1161: Eliminate/reduce an operation $22,516 $9,600 - - - - $22,516
07 4.122: Develop standard procedures to improve internal yields $158,133 $30,000 - - - $69,796 $88,337
TOTAL RECOMMENDED $210,051 $59,707 $8,255
308,031
kWh
$4,034
-
kW-mo/yr
$17,113
-
MMBtu
$69,796 $110,853
TOTAL IMPLEMENTED $186,929 $51,087 $2,246
82,064
kWh
$4,034
-
kW-mo/yr
- $69,796 $110,853
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs