Assessment Year | 1998 |
---|---|
Principal Product | Hydraulic and Cutting Fluids |
NAICS |
n/a
|
SIC | 2992: Lubricating Oils and Greases |
Sales Range | $50 M to 100M |
# of Employees | 61 |
Plant Area |
92,400
ft2
|
Annual Production | 120,000,000
lb
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,243 | 2,673,798 |
kWh
|
$0.027 |
Electricity Demand | $97,676 | 5,220 |
kW-mo/yr
|
$18.71 |
Electricity Fees | $(-2,453.0) | - |
|
- |
Natural Gas | $302,175 | 83,005 |
MMBtu
|
$3.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $210,051 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $186,929 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,424 | $1,183 |
$736
26,964
kWh
|
$688
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,856 | $10,304 |
$1,510
55,100
kWh
|
$3,346
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $426 | $1,000 |
$426
15,826
kWh
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,583 | $3,500 |
$5,583
210,141
kWh
|
- | - | - | - | |
05 | 2.2441: Preheat boiler makeup water with waste process heat | $17,113 | $4,120 | - | - |
$17,113
-
MMBtu
|
- | - | |
06 | 3.1161: Eliminate/reduce an operation | $22,516 | $9,600 | - | - | - | - | $22,516 | |
07 | 4.122: Develop standard procedures to improve internal yields | $158,133 | $30,000 | - | - | - | $69,796 | $88,337 | |
TOTAL RECOMMENDED | $210,051 | $59,707 |
$8,255
308,031
kWh
|
$4,034
-
kW-mo/yr
|
$17,113
-
MMBtu
|
$69,796 | $110,853 | ||
TOTAL IMPLEMENTED | $186,929 | $51,087 |
$2,246
82,064
kWh
|
$4,034
-
kW-mo/yr
|
- | $69,796 | $110,853 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs