ITAC Assessment: MA0209
ITAC logo
ITAC Assessment: MA0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VINYL FABRICATIONS
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 800,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,763 398,886
kWh
LPG $3,293 428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $399 - $189
2,052
kWh
- $210
02 2.6212: Turn off equipment during breaks, reduce operating time $6,297 - $6,297
63,306
kWh
- -
03 2.7221: Lower temperature during the winter season and vice-versa $1,363 - - $1,363
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $146 $200 $146
1,465
kWh
- -
05 2.6232: Install set-back timers $175 $161 $175
1,758
kWh
- -
06 2.2437: Recover waste heat from equipment $693 $598 - $693
-
MMBtu
-
TOTAL RECOMMENDED $9,073 $959 $6,807
68,581
kWh
$2,056
-
MMBtu
$210
TOTAL IMPLEMENTED $9,073 $959 $6,807
68,581
kWh
$2,056
-
MMBtu
$210
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs