ITAC Assessment: OK0411
ITAC logo
ITAC Assessment: OK0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Dairy Products
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 152
Plant Area 144,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,344
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $681,282 18,774,912
kWh
Natural Gas $149,539 55,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $1,179 $946 $1,179
33,411
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $211 $174 $211
3,224
kWh
03 2.3212: Optimize plant power factor $2,790 $3,332 $2,790
-
kWh
04 2.3511: Use plant owned transformers or lease transformers $76,619 $177,000 $76,619
-
kWh
05 2.7111: Reduce illumination to minimum necessary levels $198 $375 $198
21,395
kWh
TOTAL RECOMMENDED $80,997 $181,827 $80,997
58,030
kWh
TOTAL IMPLEMENTED $1,390 $1,120 $1,390
36,635
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs