Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0461 #01 Y:2000 Reduce space conditioning during non-working hours $15,869 $768
MA0459 #06 Y:2000 Install occupancy sensors $55 $248
MA0459 #05 Y:2000 Reduce the pressure of compressed air to the minimum required $266 $1,250
MA0459 #04 Y:2000 Optimize plant power factor $557 $1,275
MA0459 #03 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $789 $150
MA0459 #02 Y:2000 Reduce space conditioning during non-working hours $1,064 $150
MA0459 #01 Y:2000 Change procedures / equipment / operating conditions $2,945 $7,695
MA0458 #05 Y:1999 Utilize a less expensive cooling method $757 $1,000
MA0458 #04 Y:1999 Install / repair insulation on steam lines $963 $400
MA0458 #03 Y:1999 Install occupancy sensors $1,161 $600
MA0458 #02 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $2,885 $6,215
MA0458 #01 Y:1999 Use adjustable frequency drive or multiple speed motors on existing system $7,269 $64,000
MA0457 #06 Y:1999 Utilize higher efficiency lamps and/or ballasts $1,317 $2,000
MA0457 #05 Y:1999 Use adjustable frequency drive or multiple speed motors on existing system $2,246 $4,225
MA0457 #04 Y:1999 Use adjustable frequency drive or multiple speed motors on existing system $8,519 $9,750
MA0457 #03 Y:1999 Use waste heat from hot flue gases to preheat $24,685 $33,280
MA0457 #02 Y:1999 Use closed cycle process to minimize waste water production $55,054 $400,000
MA0457 #01 Y:1999 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $113,982 $160,909
MA0456 #12 Y:1999 Use adjustable frequency drive or multiple speed motors on existing system $1,175 $3,400
MA0456 #11 Y:1999 Use adjustable frequency drive or multiple speed motors on existing system $1,457 $4,925