ITAC Assessment: MA0458
ITAC logo
ITAC Assessment: MA0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Yogurt and Cultured Milk Products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 77,000
ft2
Annual Production 88,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,858 4,432,884
kWh
Electricity Demand $82,209 10,672
kW-mo/yr
Electricity Fees $8,137 -
LPG $76,112 15,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,766

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,269 $64,000 $7,269
84,408
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,885 $6,215 $3,029
35,170
kWh
$582
-
kW-mo/yr
$(-726.0)
-
MMBtu
03 2.7135: Install occupancy sensors $1,161 $600 $1,161
13,482
kWh
- -
04 2.2136: Install / repair insulation on steam lines $963 $400 - - $963
-
MMBtu
05 2.2628: Utilize a less expensive cooling method $757 $1,000 $757
8,792
kWh
- -
TOTAL RECOMMENDED $13,035 $72,215 $12,216
141,852
kWh
$582
-
kW-mo/yr
$237
-
MMBtu
TOTAL IMPLEMENTED $5,766 $8,215 $4,947
57,444
kWh
$582
-
kW-mo/yr
$237
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs