| Assessment Year | 2004 |
|---|---|
| Principal Product | alloy metals |
| NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 107 |
| Plant Area |
110,000
ft2
|
| Annual Production | 975,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $282,596 | 5,125,373 |
kWh
|
$0.055 |
| Electricity Demand | $190,896 | 22,955 |
kW-mo/yr
|
$8.32 |
| Natural Gas | $31,324 | 4,325 |
MMBtu
|
$7.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $45,236 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $20,507 | - | - | - | $20,507 | |
| 02 | 2.6218: Turn off equipment when not in use | $13,590 | - |
$13,590
247,104
kWh
|
- | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,884 | - | - |
$9,884
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $964 | - |
$964
17,533
kWh
|
- | - | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $1,647 | $712 |
$1,647
29,952
kWh
|
- | - | |
| 06 | 2.7131: Add area lighting switches | $291 | $680 |
$291
5,293
kWh
|
- | - | |
| TOTAL RECOMMENDED | $46,883 | $1,392 |
$16,492
299,882
kWh
|
$9,884
-
kW-mo/yr
|
$20,507 | ||
| TOTAL IMPLEMENTED | $45,236 | $680 |
$14,845
269,930
kWh
|
$9,884
-
kW-mo/yr
|
$20,507 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs