ITAC Assessment: SU0180
ITAC logo
ITAC Assessment: SU0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product alloy metals
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 110,000
ft2
Annual Production 975,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,596 5,125,373
kWh
Electricity Demand $190,896 22,955
kW-mo/yr
Natural Gas $31,324 4,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,236

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $20,507 - - - $20,507
02 2.6218: Turn off equipment when not in use $13,590 - $13,590
247,104
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,884 - - $9,884
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $964 - $964
17,533
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $1,647 $712 $1,647
29,952
kWh
- -
06 2.7131: Add area lighting switches $291 $680 $291
5,293
kWh
- -
TOTAL RECOMMENDED $46,883 $1,392 $16,492
299,882
kWh
$9,884
-
kW-mo/yr
$20,507
TOTAL IMPLEMENTED $45,236 $680 $14,845
269,930
kWh
$9,884
-
kW-mo/yr
$20,507
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs