Assessment Year | 2000 |
---|---|
Principal Product | Paper |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
185,000
ft2
|
Annual Production | 11,500
ton
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $823,924 | 12,449,883 |
kWh
|
$0.066 |
Electricity Demand | $204,379 | 32,093 |
kW-mo/yr
|
$6.37 |
Natural Gas | $323,752 | 110,085 |
MMBtu
|
$2.94 |
Fuel Oil #6 | $142,500 | 45,600 |
MMBtu
|
$3.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $507,499 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,191 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Disposal Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.114: Add/modify equipment to improve drying process | $298,233 | $84,000 |
$(-6,925.0)
(-107,268)
kWh
|
$(-1,117.0)
-
kW-mo/yr
|
$6,275
-
MMBtu
|
- | - | - | $300,000 | - | |
02 | 2.3321: Use steam pressure reduction to generate power | $127,075 | $218,000 |
$124,619
1,930,246
kWh
|
$20,067
-
kW-mo/yr
|
$(-13,436.0)
-
MMBtu
|
$(-4,175.0)
-
MMBtu
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $37,815 | $84,000 |
$(-6,925.0)
(-107,268)
kWh
|
$(-1,117.0)
-
kW-mo/yr
|
$35,866
-
MMBtu
|
$9,991
-
MMBtu
|
- | - | - | - | |
04 | 2.1133: Adjust burners for efficient operation | $12,426 | - | - | - |
$14,826
-
MMBtu
|
- | - | $(-2,400.0) | - | - | |
05 | 2.3321: Use steam pressure reduction to generate power | $10,122 | $16,000 |
$10,122
156,800
kWh
|
- | - | - | - | - | - | - | |
06 | 3.4151: Minimize water usage | $8,467 | $8,625 |
$4,978
77,081
kWh
|
- | - | - |
$3,489
-
Tgal
|
- | - | - | |
07 | 2.2135: Repair and eliminate steam leaks | $3,929 | $250 | - | - |
$3,570
-
MMBtu
|
$1,109
-
MMBtu
|
- | - | - | $(-750.0) | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $3,240 | $5,500 | - | - | - | - |
$3,240
-
Tgal
|
- | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,914 | $4,925 |
$1,646
25,498
kWh
|
$268
-
kW-mo/yr
|
- | - | - | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,646 | $4,225 |
$1,646
25,498
kWh
|
- | - | - | - | - | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,457 | $4,925 |
$1,457
22,567
kWh
|
- | - | - | - | - | - | - | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,175 | $3,400 |
$832
12,896
kWh
|
$343
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $507,499 | $433,850 |
$131,450
2,036,050
kWh
|
$18,444
-
kW-mo/yr
|
$47,101
-
MMBtu
|
$6,925
-
MMBtu
|
$6,729
-
Tgal
|
$(-2,400.0) | $300,000 | $(-750.0) | ||
TOTAL IMPLEMENTED | $82,191 | $131,850 |
$13,756
213,072
kWh
|
$(-506.0)
-
kW-mo/yr
|
$54,262
-
MMBtu
|
$11,100
-
MMBtu
|
$6,729
-
Tgal
|
$(-2,400.0) | - | $(-750.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Disposal Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs