ITAC Assessment: MA0206
ITAC logo
ITAC Assessment: MA0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area
n/a
Annual Production 336,000
thousand feet
Production Hrs. Annual 4,590
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,430 1,652,110
kWh
Natural Gas $36,241 9,141
MMBtu
LPG $5,560 40,304
MMBtu
Fuel Oil #4 $50,778 12,241
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.3212: Optimize plant power factor $20,259 $14,186 $20,259
24,619
kWh
- -
02 2.7444: Close holes and openings in building such as broken windows $10,773 $45,415 - $4,506
-
MMBtu
$6,267
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $498 $145 $498
5,862
kWh
- -
04 2.6232: Install set-back timers $864 $473 $864
9,086
kWh
- -
05 2.6218: Turn off equipment when not in use $742 - $742
8,792
kWh
- -
TOTAL RECOMMENDED $33,136 $60,219 $22,363
48,359
kWh
$4,506
-
MMBtu
$6,267
-
MMBtu
TOTAL IMPLEMENTED $33,136 $60,219 $22,363
48,359
kWh
$4,506
-
MMBtu
$6,267
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs