ITAC Assessment: MA0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Flocked Cloth
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 197,040
ft2
Annual Production 45,000
thousand feet
Production Hrs. Annual 8,232
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,662 8,071,219
kWh
Electricity Demand $81,232 16,789
kW-mo/yr
Electricity Fees $34,368 -
Natural Gas $411,201 60,741
MMBtu
Fuel Oil #6 $41,472 17,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Water Disposal Savings By-product Production Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $113,982 $160,909 $94,378
1,490,328
kWh
$36,590
-
kW-mo/yr
$(-13,986.0)
-
MMBtu
- $(-3,000.0)
02 3.4111: Use closed cycle process to minimize waste water production $55,054 $400,000 - - - $67,054
-
Tgal
$(-12,000.0)
03 2.2414: Use waste heat from hot flue gases to preheat $24,685 $33,280 - - $24,685
-
MMBtu
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,519 $9,750 $8,519
134,525
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,246 $4,225 $2,246
35,463
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,317 $2,000 $1,129
17,878
kWh
$188
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $205,803 $610,164 $106,272
1,678,194
kWh
$36,778
-
kW-mo/yr
$10,699
-
MMBtu
$67,054
-
Tgal
$(-15,000.0)
TOTAL IMPLEMENTED $28,248 $39,505 $3,375
53,341
kWh
$188
-
kW-mo/yr
$24,685
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Water Disposal Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs