Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166,718

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0053 #01 Y:2025 Apply for tax-free status for energy purchases $41,635 $5,000
WM0251 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $8,704 -
WM0251 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,199 $13,308
WM0251 #01 Y:2025 Reduce space conditioning during non-working hours $41,495 -
UW2510 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,923 $9,402
UW2510 #02 Y:2025 Add equipment/ operators to reduce production bottleneck $10,639,200 $32,000,000
UW2510 #01 Y:2025 Install compressor air intakes in coolest locations $1,701 $4,278
UD1126 #03 Y:2025 Pay utility bills on time $2,991 -
UD1126 #02 Y:2025 Meter recycled water (to reduce sewer charges) $9,848 $2,500
UD1126 #01 Y:2025 Change rate schedules or other changes in utility service $32,372 -
UD1125 #05 Y:2025 Install occupancy sensors $1,480 $1,208
UD1125 #04 Y:2025 Reduce space conditioning during non-working hours $57,613 $3,735
UD1125 #03 Y:2025 Eliminate or reduce compressed air usage $4,431 -
UD1125 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,992 $953
UD1125 #01 Y:2025 Pay utility bills on time $11,153 -
MUCM33 #10 Y:2025 Pay bills on time to avoid late fees $214 -
MUCM33 #09 Y:2025 Close holes and openings in building such as broken windows $9,018 $112
MUCM33 #08 Y:2025 Install timers and/or thermostats $463 $915
MUCM33 #07 Y:2025 Reduce illumination to minimum necessary levels $1,846 -
MUCM33 #06 Y:2025 Turn off equipment when not in use $253 -