| Assessment Year | 2026 |
|---|---|
| Principal Product | Drug, Pharmaceutical |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
32,382
ft2
|
| Annual Production | 300
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $460,796 | 5,857,200 |
kWh
|
$0.079 | |
| Electricity Demand | $75,892 | 10,854 |
kW-mo/yr
|
$6.99 | |
| Electricity Fees | $21,652 | - |
|
- | |
| Natural Gas | $424,900 | 31,006 |
MMBtu
|
$13.70 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,504 | 210,000 |
Tgal
|
$0.007 | |
| TOTAL YEARLY COSTS | $984,744 | ||||
| RECOMMENDED SAVINGS* | $164,356 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2611: Moderate cooling tower outlet temperature | $30,745 | $300 |
$30,745
373,122
kWh
|
- | - | - | |
| 02 | 2.7134: Use photocell controls | $3,139 | $32,600 |
$2,353
28,560
kWh
|
$786
-
kW-mo/yr
|
- | - | |
| 03 | 3.4151: Minimize water usage | $1,478 | $4,580 | - | - | - |
$1,478
-
Tgal
|
|
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $31,214 | $2,500 |
$31,214
378,810
kWh
|
- | - | - | |
| 05 | 2.1224: Replace boiler | $96,673 | $218,500 | - | - |
$96,673
-
MMBtu
|
- | |
| 06 | 2.2511: Insulate bare equipment | $1,107 | $300 | - | - |
$1,107
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $164,356 | $258,780 |
$64,312
780,492
kWh
|
$786
-
kW-mo/yr
|
$97,780
-
MMBtu
|
$1,478
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs