ITAC Assessment: UW2513
ITAC logo
ITAC Assessment: UW2513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Drug, Pharmaceutical
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 32,382
ft2
Annual Production 300
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,796 5,857,200
kWh
Electricity Demand $75,892 10,854
kW-mo/yr
Electricity Fees $21,652 -
Natural Gas $424,900 31,006
MMBtu
Waste Disposal Costs
Water Usage $1,504 210,000
Tgal
TOTAL YEARLY COSTS $984,744
RECOMMENDED SAVINGS* $164,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.2611: Moderate cooling tower outlet temperature $30,745 $300 $30,745
373,122
kWh
- - -
02 2.7134: Use photocell controls $3,139 $32,600 $2,353
28,560
kWh
$786
-
kW-mo/yr
- -
03 3.4151: Minimize water usage $1,478 $4,580 - - - $1,478
-
Tgal
04 2.6231: Utilize controls to operate equipment only when needed $31,214 $2,500 $31,214
378,810
kWh
- - -
05 2.1224: Replace boiler $96,673 $218,500 - - $96,673
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,107 $300 - - $1,107
-
MMBtu
-
TOTAL RECOMMENDED $164,356 $258,780 $64,312
780,492
kWh
$786
-
kW-mo/yr
$97,780
-
MMBtu
$1,478
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs