| Assessment Year | 2026 |
|---|---|
| Principal Product | Aluminum, Brass and Iron Castings |
| NAICS | 331529: Other Nonferrous Metal Foundries (except Die-Casting) |
| SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
| Sales Range | $5 M to 10M |
| # of Employees | 35 |
| Plant Area |
40,000
ft2
|
| Annual Production | 600,000
units
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $96,304 | 1,155,360 |
kWh
|
$0.083 | |
| Electricity Demand | $36,361 | 6,278 |
kW-mo/yr
|
$5.79 | |
| Electricity Fees | $8,781 | - |
|
- | |
| Natural Gas | $66,234 | 4,711 |
MMBtu
|
$14.06 | |
| Waste Disposal Costs | |||||
| Solid Waste (haz) | $110,000 | 2,100,000 |
lb
|
$0.052 | |
| TOTAL YEARLY COSTS | $317,680 | ||||
| RECOMMENDED SAVINGS* | $125,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $104,500 | $930,000 | - | - |
$104,500
-
lb
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,470 | $20,907 |
$1,914
22,891
kWh
|
$556
-
kW-mo/yr
|
- | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $13,655 | $102,000 |
$13,655
163,335
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $4,505 | $960 |
$3,491
41,756
kWh
|
$1,014
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $125,130 | $1,053,867 |
$19,060
227,982
kWh
|
$1,570
-
kW-mo/yr
|
$104,500
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs