ITAC Assessment: OK0993
ITAC logo
ITAC Assessment: OK0993
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product surgical equipment
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 2,447,018
units
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,352 2,542,000
kWh
Electricity Demand $69,636 11,606
kW-mo/yr
Natural Gas $13,156 2,863
MMBtu
Waste Disposal Costs
Water Usage $8,985 711
Tgal
TOTAL YEARLY COSTS $234,129
RECOMMENDED SAVINGS* $22,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $11,376 $41,363 - - $11,376 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $626 $5,696 $626
11,177
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,437 $19,768 $5,757
102,832
kWh
$1,680
-
kW-mo/yr
- -
04 2.7231: Use radiant heater for spot heating $3,414 $13,656 - - - $3,414
-
MMBtu
TOTAL RECOMMENDED $22,853 $80,483 $6,383
114,009
kWh
$1,680
-
kW-mo/yr
$11,376 $3,414
-
MMBtu
TOTAL IMPLEMENTED $19,439 $66,827 $6,383
114,009
kWh
$1,680
-
kW-mo/yr
$11,376 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs