ITAC Assessment: SF0118
ITAC logo
ITAC Assessment: SF0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Roofing Rolls
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 45,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,009 3,011,137
kWh
Electricity Demand $103,060 7,983
kW-mo/yr
Natural Gas $127,779 45,723
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,676 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,575 $2,700 $1,602
28,136
kWh
$973
-
kW-mo/yr
- -
02 2.7134: Use photocell controls $3,456 $2,000 $1,933
33,998
kWh
$1,523
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $1,464 $1,356 $974
17,292
kWh
$490
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $1,631 $2,409 - - $1,631 -
05 2.8114: Change rate schedules or other changes in utility service $31,007 $140,000 - - $31,007 -
06 2.2136: Install / repair insulation on steam lines $369 $365 $369
66,530
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,770 $14,926 $4,770
84,115
kWh
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,598 $14,138 $3,598
63,306
kWh
- - -
09 3.5316: Contract a wood pallet recycling company $499 $250 - - - $499
-
lb
10 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $4,583 $500 - - - $4,583
-
lb
11 4.122: Develop standard procedures to improve internal yields $46,724 $32,060 - - - $46,724
-
lb
TOTAL RECOMMENDED $100,676 $210,704 $13,246
293,377
kWh
$2,986
-
kW-mo/yr
$32,638 $51,806
-
lb
TOTAL IMPLEMENTED $68,038 $68,295 $13,246
293,377
kWh
$2,986
-
kW-mo/yr
- $51,806
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs