Assessment Year | 1997 |
---|---|
Principal Product | Roofing Rolls |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
45,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,009 | 3,011,137 |
kWh
|
$0.057 |
Electricity Demand | $103,060 | 7,983 |
kW-mo/yr
|
$12.91 |
Natural Gas | $127,779 | 45,723 |
MMBtu
|
$2.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,038 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,575 | $2,700 |
$1,602
28,136
kWh
|
$973
-
kW-mo/yr
|
- | - | |
02 | 2.7134: Use photocell controls | $3,456 | $2,000 |
$1,933
33,998
kWh
|
$1,523
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,464 | $1,356 |
$974
17,292
kWh
|
$490
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $1,631 | $2,409 | - | - | $1,631 | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $31,007 | $140,000 | - | - | $31,007 | - | |
06 | 2.2136: Install / repair insulation on steam lines | $369 | $365 |
$369
66,530
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,770 | $14,926 |
$4,770
84,115
kWh
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,598 | $14,138 |
$3,598
63,306
kWh
|
- | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $499 | $250 | - | - | - |
$499
-
lb
|
|
10 | 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance | $4,583 | $500 | - | - | - |
$4,583
-
lb
|
|
11 | 4.122: Develop standard procedures to improve internal yields | $46,724 | $32,060 | - | - | - |
$46,724
-
lb
|
|
TOTAL RECOMMENDED | $100,676 | $210,704 |
$13,246
293,377
kWh
|
$2,986
-
kW-mo/yr
|
$32,638 |
$51,806
-
lb
|
||
TOTAL IMPLEMENTED | $68,038 | $68,295 |
$13,246
293,377
kWh
|
$2,986
-
kW-mo/yr
|
- |
$51,806
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs