| Assessment Year | 2014 |
|---|---|
| Principal Product | Frozen Vegetables, Grains, Legumes, and Fruit |
| NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
| SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
83,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 6,432
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $422,199 | 9,317,000 |
kWh
|
$0.045 |
| Electricity Demand | $198,839 | 24,535 |
kW-mo/yr
|
$8.10 |
| Electricity Fees | $34,634 | - |
|
- |
| Natural Gas | $250,731 | 52,156 |
MMBtu
|
$4.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $50,753 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $18,202 | $6,792 | - | - |
$18,202
-
MMBtu
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,945 | $1,000 |
$1,567
32,895
kWh
|
$378
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1116: Improve combustion control capability | $11,422 | $7,219 |
$2,361
49,561
kWh
|
- |
$9,061
-
MMBtu
|
- | - | |
| 04 | 2.4224: Upgrade controls on compressors | $7,138 | $5,500 |
$5,444
114,278
kWh
|
$1,694
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $5,445 | $6,461 | - | - |
$5,445
-
MMBtu
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $3,138 | $5,659 | - | - |
$3,138
-
MMBtu
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,463 | $3,437 |
$2,468
51,809
kWh
|
$886
-
kW-mo/yr
|
- | $119 | $(-10.0) | |
| TOTAL RECOMMENDED | $50,753 | $36,068 |
$11,840
248,543
kWh
|
$2,958
-
kW-mo/yr
|
$35,846
-
MMBtu
|
$119 | $(-10.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs