ITAC Assessment: OR0626
ITAC logo
ITAC Assessment: OR0626
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Frozen Vegetables, Grains, Legumes, and Fruit
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 83,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,432
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $422,199 9,317,000
kWh
Electricity Demand $198,839 24,535
kW-mo/yr
Electricity Fees $34,634 -
Natural Gas $250,731 52,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $18,202 $6,792 - - $18,202
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,945 $1,000 $1,567
32,895
kWh
$378
-
kW-mo/yr
- - -
03 2.1116: Improve combustion control capability $11,422 $7,219 $2,361
49,561
kWh
- $9,061
-
MMBtu
- -
04 2.4224: Upgrade controls on compressors $7,138 $5,500 $5,444
114,278
kWh
$1,694
-
kW-mo/yr
- - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $5,445 $6,461 - - $5,445
-
MMBtu
- -
06 2.2511: Insulate bare equipment $3,138 $5,659 - - $3,138
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,463 $3,437 $2,468
51,809
kWh
$886
-
kW-mo/yr
- $119 $(-10.0)
TOTAL RECOMMENDED $50,753 $36,068 $11,840
248,543
kWh
$2,958
-
kW-mo/yr
$35,846
-
MMBtu
$119 $(-10.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs