| Assessment Year | 2026 |
|---|---|
| Principal Product | Wooden Pallets |
| NAICS | 321920: Wood Container and Pallet Manufacturing |
| SIC | 2448: Wood Pallets and Skids |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
500,000
ft2
|
| Annual Production | 1,717,323
units
|
| Production Hrs. Annual | 4,836
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $166,470 | 1,739,308 |
kWh
|
$0.096 |
| Electricity Demand | $64,490 | 7,384 |
kW-mo/yr
|
$8.73 |
| Electricity Fees | $49,321 | - |
|
- |
| LPG | $17,506 | 850 |
MMBtu
|
$20.59 |
| TOTAL YEARLY COSTS | $297,787 | |||
| RECOMMENDED SAVINGS* | $434,755 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $20,234 | $31,063 |
$(-3,008.0)
(-31,332)
kWh
|
$(-782.0)
-
kW-mo/yr
|
- | $24,024 | |
| 02 | 2.3191: Use demand controller or load shedder | $16,202 | $9,357 |
$11,688
121,752
kWh
|
$4,514
-
kW-mo/yr
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $14,054 | $12,848 |
$9,600
99,996
kWh
|
$4,454
-
kW-mo/yr
|
- | - | |
| 04 | 2.4112: Install soft-start to eliminate nuisance trips | $3,072 | $10,464 |
$3,072
32,000
kWh
|
- | - | - | |
| 05 | 2.7261: Install timers and/or thermostats | $1,257 | $427 |
$1,257
13,098
kWh
|
- | - | - | |
| 06 | 2.2623: Minimize condenser cooling water temperature | $846 | $774 |
$846
8,812
kWh
|
- | - | - | |
| 07 | 4.445: Install equipment to move product | $234,219 | $330,000 |
$(-1,152.0)
(-12,000)
kWh
|
$(-629.0)
-
kW-mo/yr
|
$90,000 | $146,000 | |
| 08 | 4.112: Replace old machine with new automatic multi-station tool | $144,871 | $300,000 |
$(-776.0)
(-8,088)
kWh
|
$(-353.0)
-
kW-mo/yr
|
- | $146,000 | |
| TOTAL RECOMMENDED | $434,755 | $694,933 |
$21,527
224,238
kWh
|
$7,204
-
kW-mo/yr
|
$90,000 | $316,024 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs