ITAC Assessment: UF0638
ITAC logo
ITAC Assessment: UF0638
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wooden Pallets
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 500,000
ft2
Annual Production 1,717,323
units
Production Hrs. Annual 4,836
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,470 1,739,308
kWh
Electricity Demand $64,490 7,384
kW-mo/yr
Electricity Fees $49,321 -
LPG $17,506 850
MMBtu
TOTAL YEARLY COSTS $297,787
RECOMMENDED SAVINGS* $434,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $20,234 $31,063 $(-3,008.0)
(-31,332)
kWh
$(-782.0)
-
kW-mo/yr
- $24,024
02 2.3191: Use demand controller or load shedder $16,202 $9,357 $11,688
121,752
kWh
$4,514
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $14,054 $12,848 $9,600
99,996
kWh
$4,454
-
kW-mo/yr
- -
04 2.4112: Install soft-start to eliminate nuisance trips $3,072 $10,464 $3,072
32,000
kWh
- - -
05 2.7261: Install timers and/or thermostats $1,257 $427 $1,257
13,098
kWh
- - -
06 2.2623: Minimize condenser cooling water temperature $846 $774 $846
8,812
kWh
- - -
07 4.445: Install equipment to move product $234,219 $330,000 $(-1,152.0)
(-12,000)
kWh
$(-629.0)
-
kW-mo/yr
$90,000 $146,000
08 4.112: Replace old machine with new automatic multi-station tool $144,871 $300,000 $(-776.0)
(-8,088)
kWh
$(-353.0)
-
kW-mo/yr
- $146,000
TOTAL RECOMMENDED $434,755 $694,933 $21,527
224,238
kWh
$7,204
-
kW-mo/yr
$90,000 $316,024
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs