Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0394 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $41,275 $43,520
WM0258 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $2,026 $1,800
WM0258 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,238 $9,275
WM0258 #03 Y:2026 Lower temperature during the winter season and vice-versa $24,568 -
WM0258 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $31,599 $86,296
WM0258 #01 Y:2026 Repair or replace steam traps $37,862 $9,600
UW2601 #05 Y:2026 Replace fossil fuel equipment with electrical equipment $54,790 $497,400
UW2601 #04 Y:2026 Install compressor air intakes in coolest locations $17,525 $8,362
UW2601 #03 Y:2026 Optimize plant power factor $37,270 $40,918
UW2601 #02 Y:2026 Eliminate or reduce compressed air usage $56,903 $23,111
UW2601 #01 Y:2026 Burn wood by-products for heat $45,129 $646,222
NT0060 #05 Y:2026 Use or replace with energy efficient substitutes $115,038 $54,957
NT0060 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,572 $5,099
NT0060 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,093 $3,695
NT0060 #02 Y:2026 Optimize plant power factor $6,593 $6,682
NT0060 #01 Y:2026 Use / purchase optimum sized compressor $28,171 $27,132
IC0344 #10 Y:2026 Keep doors and windows shut when not on use $16 -
IC0344 #09 Y:2026 Use or replace with energy efficient substitutes $13,246 $50,000
IC0344 #08 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600
IC0344 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $319 $548