ITAC Assessment: MZ0394
ITAC logo
ITAC Assessment: MZ0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product aircraft maintenance
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $100
M
to 500
M
# of Employees 1,062
Plant Area 1,300,000
ft2
Annual Production 615
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $640,309 17,013,318
kWh
Electricity Demand $878,880 37,626
kW-mo/yr
Natural Gas $377,698 62,842
MMBtu
Waste Disposal Costs
Water Usage $123,448 5,648
Tgal
TOTAL YEARLY COSTS $2,020,335
RECOMMENDED SAVINGS* $1,427,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,275 $43,520 $41,275
1,086,189
kWh
- - -
02 2.2625: Chill water to the highest temperature possible $39,211 $44,974 $14,608
384,430
kWh
$24,603
-
kW-mo/yr
- -
03 2.2622: Replace existing chiller with high efficiency model $45,369 $248,235 $16,902
444,797
kWh
$28,467
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $2,750 $8,700 $1,494
39,237
kWh
$1,256
-
kW-mo/yr
- -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $6,611 $16,100 - - $6,611
-
MMBtu
-
06 2.9121: Install wind powered electric generator $1,273,555 $6,683,350 $432,595
11,384,082
kWh
$840,960
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $17,369 $47,422 $2,525
66,550
kWh
$6,626
-
kW-mo/yr
- $8,218
08 2.7135: Install occupancy sensors $1,060 $7,800 $1,060
27,886
kWh
- - -
09 2.7111: Reduce illumination to minimum necessary levels $759 $1,500 $61
1,622
kWh
$218
-
kW-mo/yr
- $480
TOTAL RECOMMENDED $1,427,959 $7,101,601 $510,520
13,434,793
kWh
$902,130
-
kW-mo/yr
$6,611
-
MMBtu
$8,698
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs