ITAC Assessment: IC0344
ITAC logo
ITAC Assessment: IC0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Bedding, residential furniture, and specialized seating, flooring underlayment, and geotextiles
NAICS 337125: Household Furniture (except Wood and Metal) Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 900,000
thousand feet
Production Hrs. Annual 5,930
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,582 3,763,399
kWh
Electricity Demand $248,312 14,775
kW-mo/yr
Electricity Fees $40,501 -
Natural Gas $94,959 16,397
MMBtu
Other Gas $12,155 1
MMBtu
Waste Disposal Costs
Water Usage $20,964 2,308
Tgal
Water Disposal $13,474 1,693
Tgal
TOTAL YEARLY COSTS $692,947
RECOMMENDED SAVINGS* $57,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $348 $50 $237
3,387
kWh
$111
-
kW-mo/yr
- - -
02 2.3141: Use battery storage for demand control $23,871 $30,729 $(-216.7)
(-3,095)
kWh
$24,088
-
kW-mo/yr
- - -
03 2.4224: Upgrade controls on compressors $12,669 $3,021 $8,667
123,818
kWh
$4,001
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,531 $1,604 $1,703
24,330
kWh
$828
-
kW-mo/yr
- - -
05 2.2123: Insulate feedwater tank $551 $660 - - $551
-
MMBtu
- -
06 2.2136: Install / repair insulation on steam lines $954 $1,353 - - $954
-
MMBtu
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $319 $548 $215
3,069
kWh
$105
-
kW-mo/yr
- - -
08 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600 - - $2,895
-
MMBtu
- -
09 2.4322: Use or replace with energy efficient substitutes $13,246 $50,000 - - - $7,013
-
Tgal
$6,234
-
Tgal
10 2.7442: Keep doors and windows shut when not on use $16 - - - $16
-
MMBtu
- -
TOTAL RECOMMENDED $57,400 $108,565 $10,606
151,509
kWh
$29,133
-
kW-mo/yr
$4,415
-
MMBtu
$7,013
-
Tgal
$6,234
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs