| Assessment Year | 1986 |
|---|---|
| Principal Product | METAL RULERS, NAMEPLATES |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 55 |
| Plant Area |
n/a
|
| Annual Production | 220,000
lb
|
| Production Hrs. Annual | 2,160
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $36,232 | 377,784 |
kWh
|
$0.096 |
| Natural Gas | $55,370 | 7,898 |
MMBtu
|
$7.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,784 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $659 | $212 |
$659
6,741
kWh
|
- | |
| 02 | 2.2136: Install / repair insulation on steam lines | $370 | $753 | - |
$370
-
MMBtu
|
|
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,888 | $4,650 |
$(-557.0)
(-5,862)
kWh
|
$3,445
-
MMBtu
|
|
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,705 | $7,200 |
$17,006
177,315
kWh
|
$(-5,301.0)
-
MMBtu
|
|
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $17,850 | $22,500 | - |
$17,850
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $580 | $40 |
$580
6,155
kWh
|
- | |
| 07 | 2.6241: Reduce temperature of process equipment when on standby | $1,650 | $907 |
$1,650
17,292
kWh
|
- | |
| 08 | 2.7224: Reduce space conditioning during non-working hours | $5,082 | - | - |
$5,082
-
MMBtu
|
|
| TOTAL RECOMMENDED | $40,784 | $36,262 |
$19,338
201,641
kWh
|
$21,446
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs