ITAC Assessment: MA0077
ITAC logo
ITAC Assessment: MA0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL RULERS, NAMEPLATES
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 220,000
lb
Production Hrs. Annual 2,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,232 377,784
kWh
Natural Gas $55,370 7,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $659 $212 $659
6,741
kWh
-
02 2.2136: Install / repair insulation on steam lines $370 $753 - $370
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $2,888 $4,650 $(-557.0)
(-5,862)
kWh
$3,445
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,705 $7,200 $17,006
177,315
kWh
$(-5,301.0)
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $17,850 $22,500 - $17,850
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $40 $580
6,155
kWh
-
07 2.6241: Reduce temperature of process equipment when on standby $1,650 $907 $1,650
17,292
kWh
-
08 2.7224: Reduce space conditioning during non-working hours $5,082 - - $5,082
-
MMBtu
TOTAL RECOMMENDED $40,784 $36,262 $19,338
201,641
kWh
$21,446
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs