ITAC Assessment: LL0228
ITAC logo
ITAC Assessment: LL0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Farm equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 701,000
ft2
Annual Production 2,303
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $703,827 6,426,095
kWh
Electricity Demand $6,028 24,123
kW-mo/yr
Electricity Fees $25,884 -
Other Gas $44,224 3,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $440,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $322,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $79,796 $4,000 $77,023
1,031,609
kWh
$2,773 - - - -
02 2.7134: Use photocell controls $55,019 - $53,107
711,224
kWh
$1,912 - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $47,819 $22,000 $47,819
618,143
kWh
- - - - -
04 2.7224: Reduce space conditioning during non-working hours $19,616 - $18,934
253,565
kWh
$682 - - - -
05 2.4239: Eliminate or reduce compressed air usage $16,509 - $15,935
213,402
kWh
$574 - - - -
06 2.7261: Install timers and/or thermostats $14,813 - - - $14,813
-
MMBtu
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $7,945 - $7,662
105,286
kWh
$283 - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,872 - $1,715
22,969
kWh
$62 - - $2,095 -
09 2.7134: Use photocell controls $870 - $840
11,256
kWh
$30 - - - -
10 3.5217: Reuse / recycle/ sell paper products $7,627 - - - - $7,627
-
lb
- -
11 4.611: Begin a practice of predictive / preventative maintenance $106,500 $20,000 - - - - $104,000 $2,500
12 4.611: Begin a practice of predictive / preventative maintenance $80,610 $20,000 - - - - $80,610 -
TOTAL RECOMMENDED $440,996 $66,000 $223,035
2,967,454
kWh
$6,316 $14,813
-
MMBtu
$7,627
-
lb
$186,705 $2,500
TOTAL IMPLEMENTED $322,670 $66,000 $132,504
1,755,038
kWh
$3,056 - - $184,610 $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs