ITAC Assessment: UW2601
ITAC logo
ITAC Assessment: UW2601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Lumber, pallet boards, hog fuel, chips, sawdust
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 84,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $563,732 9,968,709
kWh
Electricity Demand $289,279 32,302
kW-mo/yr
Electricity Fees $16,924 -
Natural Gas $352,553 73,450
MMBtu
LPG $26,197 963
MMBtu
Fuel Oil #2 $29,777 1,128
MMBtu
TOTAL YEARLY COSTS $1,278,462
RECOMMENDED SAVINGS* $211,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 3.6123: Burn wood by-products for heat $45,129 $646,222 - - $36,729
-
MMBtu
- - $8,400
02 2.4239: Eliminate or reduce compressed air usage $56,903 $23,111 $56,903
1,007,131
kWh
- - - - -
03 2.3212: Optimize plant power factor $37,270 $40,918 - $37,270
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $17,525 $8,362 $14,399
254,851
kWh
$3,126
-
kW-mo/yr
- - - -
05 2.1321: Replace fossil fuel equipment with electrical equipment $54,790 $497,400 $(-5,718.0)
(-101,209)
kWh
- - $26,197
-
MMBtu
$29,777
-
MMBtu
$4,534
TOTAL RECOMMENDED $211,617 $1,216,013 $65,584
1,160,773
kWh
$40,396
-
kW-mo/yr
$36,729
-
MMBtu
$26,197
-
MMBtu
$29,777
-
MMBtu
$12,934
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs