| Assessment Year | 2026 |
|---|---|
| Principal Product | Asphalt Paving Mixtures |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 10 |
| Plant Area |
74,750
ft2
|
| Annual Production | 209,545
ton
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $71,539 | 1,155,600 |
kWh
|
$0.062 | |
| Electricity Demand | $63,927 | 5,798 |
kW-mo/yr
|
$11.03 | |
| Electricity Fees | $4,320 | - |
|
- | |
| Natural Gas | $308,980 | 74,096 |
MMBtu
|
$4.17 | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
| Water Disposal | $1 | 1 |
Tgal
|
$1.00 | |
| TOTAL YEARLY COSTS | $448,769 | ||||
| RECOMMENDED SAVINGS* | $153,468 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $28,171 | $27,132 | - | - | - | $28,171 | |
| 02 | 2.3212: Optimize plant power factor | $6,593 | $6,682 | - | - | $6,593 | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,093 | $3,695 |
$571
9,228
kWh
|
$522
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,572 | $5,099 |
$1,344
21,715
kWh
|
$1,228
-
kW-mo/yr
|
- | - | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $115,038 | $54,957 |
$2,358
38,088
kWh
|
- | - | $112,680 | |
| TOTAL RECOMMENDED | $153,468 | $97,565 |
$4,273
69,031
kWh
|
$1,750
-
kW-mo/yr
|
$6,593 | $140,851 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs