ITAC Assessment: NT0060
ITAC logo
ITAC Assessment: NT0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Asphalt Paving Mixtures
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 74,750
ft2
Annual Production 209,545
ton
Production Hrs. Annual 2,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,539 1,155,600
kWh
Electricity Demand $63,927 5,798
kW-mo/yr
Electricity Fees $4,320 -
Natural Gas $308,980 74,096
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
Water Disposal $1 1
Tgal
TOTAL YEARLY COSTS $448,769
RECOMMENDED SAVINGS* $153,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4226: Use / purchase optimum sized compressor $28,171 $27,132 - - - $28,171
02 2.3212: Optimize plant power factor $6,593 $6,682 - - $6,593 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,093 $3,695 $571
9,228
kWh
$522
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,572 $5,099 $1,344
21,715
kWh
$1,228
-
kW-mo/yr
- -
05 2.4322: Use or replace with energy efficient substitutes $115,038 $54,957 $2,358
38,088
kWh
- - $112,680
TOTAL RECOMMENDED $153,468 $97,565 $4,273
69,031
kWh
$1,750
-
kW-mo/yr
$6,593 $140,851
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs