ITAC Assessment: LT0099
ITAC logo
ITAC Assessment: LT0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PARBOILED RICE
NAICS
n/a
SIC 2044: Rice Milling
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area
n/a
Annual Production 10,000,000
bushels
Production Hrs. Annual 8,400
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $938,287 19,803,928
kWh
Natural Gas $511,634 181,346
MMBtu
Other Energy $129,000 129,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $263,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $40,000 $12,600 - $40,000
-
MMBtu
- -
02 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $109,000 $230,000 $410,000
10,300,117
kWh
- $(-301,000.0)
-
MMBtu
-
03 2.3191: Use demand controller or load shedder $30,300 $20,000 $30,300
-
kWh
- - -
04 2.4133: Use most efficient type of electric motors $1,780 $2,500 $1,780
44,549
kWh
- - -
05 2.2693: Use waste heat steam for absorption refrigeration $82,300 $217,000 $86,900
2,300,703
kWh
- - $(-4,600.0)
TOTAL RECOMMENDED $263,380 $482,100 $528,980
12,645,369
kWh
$40,000
-
MMBtu
$(-301,000.0)
-
MMBtu
$(-4,600.0)
TOTAL IMPLEMENTED $72,080 $35,100 $32,080
44,549
kWh
$40,000
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs