| Assessment Year | 2012 |
|---|---|
| Principal Product | aluminum die castings |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $10 M to 50M |
| # of Employees | 88 |
| Plant Area |
100,000
ft2
|
| Annual Production | 5,730
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $226,990 | 4,750,800 |
kWh
|
$0.048 |
| Natural Gas | $382,785 | 75,717 |
MMBtu
|
$5.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $108,071 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,477 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4235: Remove or close off unneeded compressed air lines | $6,681 | $200 |
$6,681
139,776
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,300 | $200 |
$3,300
69,034
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,496 | $2,000 |
$2,496
52,214
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $7,600 | $2,000 | - |
$7,600
-
MMBtu
|
|
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,676 | $4,000 | - |
$4,676
-
MMBtu
|
|
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,391 | $4,000 | - |
$19,391
-
MMBtu
|
|
| 07 | 2.2424: Use heat in flue gases to preheat products or materials | $52,867 | $2,000 | - |
$52,867
-
MMBtu
|
|
| 08 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $11,060 | $15,000 | - |
$11,060
-
MMBtu
|
|
| TOTAL RECOMMENDED | $108,071 | $29,400 |
$12,477
261,024
kWh
|
$95,594
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,477 | $2,400 |
$12,477
261,024
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs