Assessment Year | 2012 |
---|---|
Principal Product | aluminum die castings |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 88 |
Plant Area |
100,000
ft2
|
Annual Production | 5,730
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $226,990 | 4,750,800 |
kWh
|
$0.048 |
Natural Gas | $382,785 | 75,717 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,071 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,477 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4235: Remove or close off unneeded compressed air lines | $6,681 | $200 |
$6,681
139,776
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,300 | $200 |
$3,300
69,034
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,496 | $2,000 |
$2,496
52,214
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $7,600 | $2,000 | - |
$7,600
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,676 | $4,000 | - |
$4,676
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,391 | $4,000 | - |
$19,391
-
MMBtu
|
|
07 | 2.2424: Use heat in flue gases to preheat products or materials | $52,867 | $2,000 | - |
$52,867
-
MMBtu
|
|
08 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $11,060 | $15,000 | - |
$11,060
-
MMBtu
|
|
TOTAL RECOMMENDED | $108,071 | $29,400 |
$12,477
261,024
kWh
|
$95,594
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,477 | $2,400 |
$12,477
261,024
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs