ITAC Assessment: GT0629
ITAC logo
ITAC Assessment: GT0629
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product urethane fuel cells
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 560,000
ft2
Annual Production 3,800
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,858 7,274,326
kWh
Electricity Demand $203,865 19,686
kW-mo/yr
Electricity Fees $28,870 -
Natural Gas $241,075 71,138
MMBtu
Fuel Oil #2 $587 7
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,784 $2,500 $6,400
256,155
kWh
$384 - - - - -
02 2.4239: Eliminate or reduce compressed air usage $525 $150 $496
19,930
kWh
$29 - - - - -
03 2.2437: Recover waste heat from equipment $1,595 $5,050 $(-127.0)
(-4,982)
kWh
- $1,722
-
MMBtu
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $402 $965 $402
13,189
kWh
- - - - - -
05 3.4151: Minimize water usage $13,141 - - - - - - - $13,141
06 3.4154: Eliminate leaks in water lines and valves $7,415 $800 - - $7,260
-
MMBtu
$120
-
Tgal
- - $35
07 2.1233: Analyze flue gas for proper air/fuel ratio $5,680 $900 - - $6,580
-
MMBtu
- - $(-900.0) -
08 4.443: Install automatic boiler fuel feed system $153,375 $62,650 $(-157,700.0)
(-6,308,031)
kWh
- $241,075
-
MMBtu
- $70,000 - -
TOTAL RECOMMENDED $188,917 $73,015 $(-150,529.0)
(-6,023,739)
kWh
$413 $256,637
-
MMBtu
$120
-
Tgal
$70,000 $(-900.0) $13,176
TOTAL IMPLEMENTED $33,947 $5,315 $7,298
289,274
kWh
$413 $13,840
-
MMBtu
$120
-
Tgal
- $(-900.0) $13,176
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs